Odkaz facebook Odkaz novinky Odkaz Ceník

 LIFTS IN HARRACHOV - GIANT MOUNTAINS 

Transport to Čertova hora is secured by two 4-seat cableways. The cableway from Harrachov to Čertova hora (Delta) is in the centre and the second cableway connects Rýžoviště and Čertova hora (Alfa).

Doplik ski lift is situated approximately 200 m from Delta cableway in direction to big ski jumps Doplik ski lift is situated in the more moderate, lower part of Red II ski run and therefore it is suitable especially for the beginners, children or less experienced skiers.

Another cableway in Harrachov is Můstky. This cableway serves for the transport of jumpers and technicians on the access towers of ski jumps in time of races.

 

 

     

SKI LIFT HARRACHOV - ČERTOVA HORA, DELTA

OUT OF SERVICE

Operating time: 0.00-0.00
Length: 1.300 m
Elavation: 357 m
Transport capacity: 1.800 person per hour
Points: 30 points

Tel.: +420 481 528 151

 The former two-seat Delta chairlift was constructed in 1983 before the start of the Ski Jumping Championship. It had two intermediate stations that ensured the services of the ski jump area during the competition. In 2002, after almost 20 years of operation, it was replaced by a new four-seat chairlift with a loading carpet. In winter it transports skiers to the slopes and in summer it brings walkers and cyclists up to Devil’s Mountain.
      

SKI LIFT RÝŽOVIŠTĚ - ČERTOVA HORA, ALFA

OUT OF SERVICE

Operating time: 0.00-0.00
Length: 900 m
Elavation: 298 m
Transport capacity: 2.150 person per hour
Points: 30 points
Tel.: +420 481 529 611

 The Alfa chairlift replaced the earlier surface lift at Rýžoviště. It started operation in 1997 and it was the only four-seat chairlift at Harrachov at the time. This technology was supplied by the French company Poma Galski. It has a moving loading carpet and transports skiers from Rýžoviště to the ski slopes. It does not operate during summers.
    

SKI TOW (SKI-LIFT)  DOPLIK

OUT OF SERVICE

Operating time: 0.00-0.00 h 

 
Length: 400 m
Elavation: 76 m
Transport capacity: 450 person per hour
Points: 5 points
Tel.: +420 481 528 151  

  LV Doplik was built on the gentlest stretch of the Red II ski slope of the center. During the day it is used by novice or less-able skiers or children. After the chairlift’s closing time it is used for evening skiing.
 

CHAIRLIFT MŮSTKY - for ski jumping

OUT OF SERVICE
Length: 505 m
Elavation: 165 m 
Transport capacity: 212 person per hour

GPS 50°46'9.161"N, 15°25'37.302"E
Tel.: +420 481 528 151

The Můstky chairlift was constructed in 2001 during the first phase of the Delta chairlift renovations. The new chairlift did not include intermediate stations, so an alternative for providing transportation to the ski jump area had to be proposed. For this purpose, a single-seat chairlift was built for participants and organizers of ski jumping competitions.

 


NEWS

Summer operation terminated!

DO NOT OVERLOOK